Gymnasium Caspar-David-Friedrich-School

Renovation and conversion of the roof drainage system

Architect MTM Architecture
Type Conversion, Refurbishment, Interior
Service LPH 5-8
Client public
Area 750 m2
Planning and refurbishment 2020-2021

Due to continuous rainwater infiltration into the interior of the hall, caused by an undersized interior gutter, it was planned to replace the existing roof drainage with a pressure drainage system and the complete renewal of the sports floor. Due to the water damage in the interior, the gymnasium had to be taken out of service.

Construction process